General Contracting Services
Commercial Construction in Houston and the Gulf Coast
Four days of rain in 2017 put water into more than 120,000 structures in Harris County, and every commercial schedule we write now starts from that number. Houston has no mountains to hide behind and no hard rock to bear on. It has bayous, detention basins, gumbo clay and a long, wet summer, so the first question on any new commercial building is where the water goes and how high the floor sits. We answer that before we price a single square foot.
Commercial construction for us means the ground-up and major-renovation work that owners, developers and facility managers hand to a general contractor: office, retail, mixed-use, medical, hospitality, education, civic and the support buildings around them. We hold the prime contract, run preconstruction, closely manage the earthwork and concrete that decide whether a Houston building stays level, and buy out the other trades against a schedule built backwards from the permit and the weather.
The buyers who call us have usually been burned once already, by a pour that slid into a storm week or a plan review that came back with a floodplain comment nobody priced. Our job is to put those surprises on the calendar in month one rather than month nine, in plain language, with the owner in the room.
Building Where the Rules Change at the City Line
Texas has no single commercial building code edition for the whole state. State law lets each municipality adopt the International Building Code and amend it locally, so the code you design to in one city can differ from the next. The City of Houston enforces the codes it adopts, and those codes address mass timber and intermodal shipping containers as buildings, which opens doors for some owners and closes a few for lazy details.
Cities around Houston adopt on their own timelines, and unincorporated Harris County leans on its fire code and its own floodplain and drainage regulations instead of a full building code, so we confirm the governing edition with the authority on day one. A pad in Katy, a pad inside the city and a pad out in the county can sit a few miles apart and play by three different books. We keep a running matrix of what applies where, and we hand it to the design team before drawings freeze.
What a Commercial Contract With Us Covers
Preconstruction comes first: budgeting against drawings that are still moving, a site logistics plan, a geotechnical read, and a flood and drainage review that decides pad elevation. Then the building itself, from mass grading and utilities through structure, enclosure, MEP, interiors and commissioning. For owners who want one throat to choke, we carry the site work and the vertical build under the same contract.
We also handle the paper that keeps a project alive: permit tracking, inspections, accessibility registration, utility coordination with the district or city, and closeout documents your facilities team can actually use. For owners building several things at once, such as a new office building and the parking structure beside it, we sequence both under one master schedule so shared utilities and laydown areas are not fought over.
Running the Schedule Backwards From the Weather
We plan Houston work in reverse. Start with the date the owner needs the keys, subtract commissioning and punch, subtract interior finish, subtract the dry-in date, and you land on the week the slab and structure must be finished. Then we ask how many pour windows between storms it takes to get there. June through November carries the hurricane risk; the rest of the year carries the ordinary Gulf rain that turns clay into soup.
That reverse plan drives decisions that look unrelated: early release of long-lead gear, detention basins excavated first so they double as dewatering sumps, stabilized haul roads before the first truck arrives, and a standing rule that no pour is scheduled on a forecast we would not bet our own money on. Owners tend to read this as caution. We call it arithmetic.
Permits, Accessibility and Energy Code in Practice
The State Energy Conservation Office sets the commercial energy code Texas uses statewide, even where a city has moved its building code forward. Accessibility runs through the Texas Department of Licensing and Regulation: projects at or above 50,000 dollars in estimated cost must be registered with a full set of construction documents, and smaller jobs still have to comply even though they skip the review.
Inside Houston, new structures sit at least two feet above the 500-year flood elevation, and a floodplain development permit comes before the building permit in the affected areas. We route these through permitting and entitlements in the right order, so the design team is not redrawing a slab elevation in the middle of plan review. When two authorities disagree, we ask for the answer in writing and carry it in the project file.
Where Commercial Budgets Actually Move
In this market the biggest swing items are rarely the finishes. They are the drainage and detention requirement, the amount of structural fill and pier depth the soil demands, the price of getting gear to a congested site, and whatever the flood elevation does to ramps, stairs and accessible routes. A pad that has to climb two feet changes the whole entry sequence.
We put those items on the first budget page and show owners the alternates openly: a shallower footing with more soil improvement against deeper piers, a vault against open detention, a phased site against one big mobilization. If you want to see how the same thinking plays out for a specific owner type, our notes for commercial real estate developers and for property management firms go deeper on cost certainty and long-term operating cost.
Talk through your site before the drawings freeze
Send us the address, the program and the date you need to open. We will tell you what the flood, drainage and permit picture looks like and what it does to the schedule.
Common Questions
How early should the flood elevation be settled on a commercial site?
Before schematic design closes. Inside the city, new structures must clear the 500-year elevation by at least two feet, and in unincorporated Harris County a Class II permit in the 100-year floodplain can require the lowest habitable floor to sit 24 inches above the 500-year level, with fill prohibited. Those numbers move the pad, the ramps and the utility depths, so we want them confirmed in the first design meetings.
Do you build in unincorporated Harris County and inside the city?
Yes, and we price them differently. The city requires full building permits under the codes it adopts and enforces, while the county leans on its fire code and floodplain regulations, so the review path, the inspection rhythm and the drainage criteria all change. We confirm the governing authority before we commit a schedule.
What does hurricane season do to a commercial schedule?
It shortens the number of reliable pour days and raises the cost of leaving a building half enclosed. We sequence structure and dry-in to finish before the heaviest months where the calendar allows, and we carry a storm plan for crane, material and site securing in every project. The owner sees that plan on paper, not as a surprise.
Can you hold one price for site work and the building?
We can, once drawings and the geotechnical report support it. Until then we carry allowances for the items that move, mainly soil improvement, detention volume and utility tie-ins, and we tell you exactly which numbers are firm and which are not.
How do you handle a municipal utility district tie-in?
We open the conversation with the district during preconstruction, because capacity letters, tap fees and inspection hours drive the schedule as much as the field work does. A district that inspects only on certain days changes how we sequence underground work.