General Contracting Services
Office Building Construction in the Houston Metro
The Energy Corridor alone carries about 24.7 million square feet of office space, most of it Class A, and the district counts roughly 73,000 people in its daytime population. That is the scale of the Houston office market we build into: big floorplates, large parking ratios, tenants who negotiate lease start dates years ahead and expect the keys on the day. A late delivery here is a rent problem long before it is a construction problem.
We build office buildings as shell and core, as shell with the first tenant floors finished, or as owner-occupied headquarters where the tenant and the builder share a design team. In every version, the work that decides the outcome happens before vertical construction: pad elevation against the floodplain, a parking and detention layout that does not fight the building footprint, and a structural scheme that can be priced honestly by a dozen subs.
Owners who call us usually carry a lease commitment, a lender draw schedule or both. We write the schedule so each of those dates has a visible dependency behind it, and we say out loud when one of them is at risk.
Shell, Core and the Floors Above the Podium
A mid-rise or high-rise office shell is a sequence: foundations or deep piers, the podium or garage levels, the frame, the skin, then core buildout of elevators, restrooms, stairs and risers. We keep the curtain wall order of delivery tied to the crane plan, because a glass package that lands six weeks late holds every floor behind it. Core and shell are separate scopes from tenant buildout for good reason; we keep them separate on the schedule and on the cost report so an owner can see where each dollar went.
For lower-rise suburban office, the same logic runs faster: tilt or steel frame, a lighter envelope, surface or structured parking. The question changes from crane time to site drainage and fire lane geometry, and from elevator count to how quickly tenants can begin fit-out inside a dry, conditioned shell.
Two Office Markets, Two Ways to Build
The Galleria and Uptown district spans about 500 acres with more than 30 million square feet of commercial office space and thousands of hotel rooms, so construction there means tight sites, valet-width access and neighbors who notice noise. The Energy Corridor is the opposite: more than 2,000 acres along I-10 with room to stage, a lot of surface parking and a flood history tied to the Addicks and Barker reservoirs, where subdivisions took water when the Corps released flow during Hurricane Harvey.
The sale of a vacant 433,528 square foot Galleria office building in late 2026 signals something else worth planning around: owners are buying older stock to reposition it. That keeps renovation and adaptive reuse work in our estimating mix alongside new buildings, and it means office owners should ask about both paths before assuming new construction is the cheaper answer.
Lease-Driven Schedules and the Slab Calendar
An office schedule starts with the date a tenant must occupy and works back. We lock the structural frame to a pour sequence that survives the wet months, pull long-lead items such as switchgear, elevators and curtain wall into early procurement, and hold a dry-in milestone as the point after which interior trades can run regardless of weather. Houston heat adds a second constraint: outdoor crews have less productive hours in the summer afternoon, so we front-load exterior work to the morning.
Once the building is dry, the schedule is about trade stacking. Mechanical rough-in, ceilings, life safety and elevator turnover share the same floors, and the order they enter decides whether the fire marshal sees a finished system in time. We run a weekly floor-by-floor look-ahead, and we share the lookahead with the owner's tenant coordinator so their move plans never rely on a guess.
The Concrete and Site Work We Manage Closely
We closely manage the earthwork, pier and foundation concrete and the structural slabs that carry an office building, because they are also the elements that move a Houston schedule. Expansive clay and a high water table make slab-on-grade and drilled shafts specialist work, and we would rather own the quality control than rely on a handoff. Slab flatness matters to office tenants more than they expect, since raised floor systems and finish flooring will show a bad pour for years.
Close scheduling also lets us react when the weather turns. A crew we already have on site can move to an interior scope or a protected pour area in a day, where a crew with other commitments might go quiet for a week. That flexibility is the main reason we keep core site and concrete trades under close supervision.
Pairing an Office Building With the Work Around It
Office parking is rarely a side issue. Garages are a large share of structural cost, and their ramps, columns and stair cores interact with the tower above them. We often take the parking structure and the office shell under one contract so the foundations, utilities and crane picks are coordinated. Tenant floors follow through tenant improvements, which we can bid in packages as lease commitments land.
If you are weighing a site, our pages on the Energy Corridor and Uptown and the Galleria describe how site conditions differ, and our work for property management firms covers what happens after the ribbon is cut, including warranty response and operating cost.
Plan the shell, the core and the lease date together
Bring us the site, the lease commitments and the target occupancy. We will return a phased schedule and a first budget that shows the flood and parking assumptions in plain view.
Common Questions
How much schedule float does an office build really have?
Most office owners have a lease commencement date with a rent abatement clock behind it, so even a few weeks matter. We give a critical path with named float, tell the owner which activities have none, and recommend early procurement for elevators, switchgear and glass. If you are within two months of a lease date at design start, we usually suggest phasing the core and shell ahead of the full buildout.
Does the floodplain affect where an office building can sit on its parcel?
It can. Houston standards put new structures at least two feet above the 500-year flood elevation, and that pad height changes ramp slopes, entries and parking layouts. We check this at the site-selection stage so the building is shaped around the constraint instead of fitted to it afterward.
Do you take on tenant buildout as well as shell and core?
Yes. Many owners prefer one builder for both so that the base building systems and the tenant systems are coordinated. We price them as separate scopes so the tenant improvement allowance can be tracked clearly.
What kind of parking structure fits an office building here?
That depends on ratio and site. Structured parking is common in the dense Galleria area and surface-heavy plans suit suburban parks, but both have to account for detention and fire lane access. We study both options during preconstruction.